TEN-T 2007-2013

RTE-T
Programming 2007- 2013
fundoFinanciamento1

Studies and work on the South-West Europe High-Speed Rail Link (PP3) - Lisbon-Madrid Axis - Évora-Mérida cross-border stretch

Code: 2007-EU-03080-P

Total Cost of Investiment:

22.2 million euros

Funding:

64.4 million euros

fundoFinanciamento2

Preparatory contract work to implement the link between the Third Tagus

Crossing and Oriente Station-Lisbon, an integral part of the Lisbon-Madrid (PP3) High-Speed Rail Link

Code: 2009-PT-03082-E

Total Cost of Investiment:

27 million euros

Funding:

1.5 million euros

fundoFinanciamento1

Studies on the Alcântara underground rail section - PP8

Code: 2010-PT-91129-S

Total Cost of Investment:

3.3 million euros

Funding:

0.5 million euros

fundoFinanciamento2

Regulation (EU) No 913/2010 of the European Parliament and of the Council of 22 September 2010 concerning a European rail network

for competitive freight Implementation of Freight Corridor No 4

Code: 2011-EU-95107-S

Total Cost of Investment:

2.1 million euros

Funding:

2.1 million euros

fundoFinanciamento1

Study on the implementing and creation of rail freight transport

corridors, including pilot projects and telematic applications to apply to ETI

Code: 2012-EU-94031-S

Total Cost of Investment:

15.6 million euros

Funding:

7.8 million euros

fundoFinanciamento2

Preparation of Technical Rules for a 3 Rail Infrastructure

Code: 2013-PT-91039-S

Total Cost of Investment:

0.8 million euros

Funding:

0.4 million euros

fundoFinanciamento1

Accelerating/Facilitating of the Implementation of the Atlantic Corridor

Code: 2013-EU-91053-S

Total Cost of Investment:

2.1 million euros

Funding:

1 million euros